The hand rail for the stairway was put in this week. It received two coats of white paint. Next two panels of frosted plexiglass will be put in.
Friday, February 22, 2013
Sunday, February 17, 2013
Front Door
We finally have a door!
It needs to have a coat of clear varnish, but it works great. It has a very slick hidden closing mechanism, which allows it to close by itself or when pushed all the way open, to stay in place.
It needs to have a coat of clear varnish, but it works great. It has a very slick hidden closing mechanism, which allows it to close by itself or when pushed all the way open, to stay in place.
Friday, February 15, 2013
Interior Doors
The company which is building our interior doors arrived to test fit all of the doors. They spent most of a day adjusting the doors and fitting the sliders and hardware. They then took the doors back to their workshop for painting and to install the handles.
These little guys ride along the top of the door and fit into the slider bar.
These little guys ride along the top of the door and fit into the slider bar.
Tile Details
I've been tiling nonstop. The end is getting close for the work on the walls. But there are many fiddly bits ahead. Including these complicated 45 degree joints.
Working on the bottoms of the walls is also challenging.
Working on the bottoms of the walls is also challenging.
The shampoo niche is getting closer to being finished.
Yoko Painting
Yoko has been painting every day for two weeks.
She was getting tired of only white paint. So she was very happy when her Farrow and Ball paint arrived.
She was getting tired of only white paint. So she was very happy when her Farrow and Ball paint arrived.
There is a can of grey paint for our bedroom wall and a greenish blue paint for one of Motoki's walls.
Thursday, February 7, 2013
Speakers and Kitchen
I installed a pair of Yamaha in wall speakers on either side of our main AC unit.
Our Kitchen arrived.
It will get assembled and put into place over the next few days...
Our Kitchen arrived.
It will get assembled and put into place over the next few days...
Wednesday, February 6, 2013
Septic System
Some heavy equipment arrived to put in our septic system.
First they dug a hole.
First they dug a hole.
This tank gets buried in the ground.
Tuesday, February 5, 2013
Scaffold Comes Down
The big scaffolding around the exterior finally comes down.
The house looks so much better without it.
Before:
After:
The house looks so much better without it.
Before:
After:
Saturday, February 2, 2013
Friday, February 1, 2013
Tiling begins
We were able to finish one wall of the bathroom. We're very pleased with the tiles and the design.