We're on the second week of 'putty'. The third coat is on in most rooms, sanding, sealing and priming has began.
The final skim coat of cement is being spread on the bathroom walls in preparation for tiling.
The entryway closet is getting shelving installed.
The hot and cold water lines have been run in the basement, with color coded insulated piping.