Saturday, December 8, 2012

More flooring and siding prep.

Preparation for the siding has begun. They put on the lower trim and added the narrow strips of wood which the siding will attach to.
EDIT - A few days later additional wood panels and sheetrock was added to the exterior to reinforce the areas where the AC units, fans and other exterior items, such as the laundry rod system, will be hung.

The flooring is almost finished getting installed in the master bedroom and adjoining walk in closet.

The shower/bathroom got a fresh coat of cement. We also had to have the doorway moved slightly over so that the edge of tub lines up with the door. A slight oversight on the part of the architect. Luckily Sugimoto-san caught the alignment issue and it was able to be corrected.

No comments:

Post a Comment