Friday, July 12, 2013

Deck Construction Day 2

First the aluminum siding had to be removed along the bottom of the house in order to attach the brackets for the iron frame.
These are the brackets to be attached to the house.
Bolted in place.
Holes are drilled in the concrete foundation for the iron framing, which will arrive the following day.



No comments:

Post a Comment