I've been painting the deck for the past four days.
Meanwhile the railing for the stairs and the second floor balcony were installed.
The Ipe decking arrived.
Concrete footings were added to the base of the columns.
A concrete step was also poured for the bottom of the stairs.
Here is an overall view.