We stopped by the house to see that the flooring was mostly installed in the studio on the second floor. It looked great.
Tools of the trade, air nailer and eco glue.
When we came back the next day the floor was finished in the studio, but covered up to protect it during the rest of the construction. We were glad to have got a glimpse the day before.
Work had begun on the flooring in Motoki's room, he's looking forward to having his own space.
No comments:
Post a Comment